![]() ![]() Some shales, for example, have such low permeability that they effectively form an aquiclude.ĪQUIFER – A saturated water-bearing formation, or group of formations, which yield water in sufficient quantity to be of consequence as a source of supply.ĪQUIFER SYSTEM – Heterogeneous body of interbedded permeable and poorly permeable material that functions regionally as a water-yielding unit. In times of shortage, junior appropriators are cut off while senior appropriators receive their full allotment.ĪQUICLUDE – An impermeable layer of rock that does not allow water to move through it. Appropriative water rights have a priority based on the date of first usage. Equal to 43,560 cubic feet or 325,851 gallons, or 1,233 cubic meters.ĪDJUDICATION – Judicial process to determine the extent and priority of the rights of persons to use water in a river or aquifer system.ĪLLUVIAL AQUIFER – An aquifer formed by material laid down by physical processes in a stream channel or on a floodplain.ĪLLUVIAL PLAIN – A level, gently sloping, or slightly undulating land surface produced by extensive deposition of alluvium, usually adjacent to a stream that periodically overflows its banks.ĪLLUVIUM – Unconsolidated clay, silt, sand, or gravel deposited during recent geologic time by running water in the bed of a stream or on its floodplain.ĪNALYTICAL MODEL – Model that uses closed-form mathematical solutions to the governing equations applicable, for example, to ground-water flow and transport processes.ĪNISOTROPY – Condition of having different properties in different directions.ĪPPROPRIATION – The right to use water for a beneficial use or the acquisition of such a right gained through the process of diverting water and putting it to a beneficial use.ĪPPROPRIATIVE RIGHTS – Appropriative water rights, generally found in western states, are created by diversion of water and putting it to beneficial use. ACRE-FOOT – The volume of water required to cover one acre to a depth of one foot. This entry was posted in Articles, News and tagged accessories, basf, masterseal, on the job video, primer, sealant, tools. Atlas Supply – Tapes, Tools and Accessories.Atlas Supply – Expansion Joint Systems, Joint Fillers.Atlas Supply – Master Builders Solutions.Master Builders Solutions – MasterSeal P 173 Primer.Respiratory Protection – In case of inadequate ventilation.Refer to the MasterSeal P 173 Safety Data Sheet ( SDS) for more information. MasterSeal P 173 Primer – Quick drying, solvent-based primer for priming joints and substrates.Protective Clothing – Long-sleeve sweatshirt.Protective Gloves – 4-mil nitrile, disposable glove. ![]() Primer Application Materials, Tools and Accessories Materials, Tools and Accessories – Shown Refer to the MasterSeal P 173 technical data guide for more information.Sealant must be applied the same day as the primer.Allow primer to dry tack-free before applying sealant.Using a brush apply a thin, uniform coat to the joint surface.Prime joint before installing backer rod (protect adjacent surfaces from primer).Ensure substrate is structurally sound, fully cured, dry and clean.MasterSeal P 173 Primer Application Video Transcript Then learn more about the materials, tools and accessories required to do the job safely and efficiently. Watch how to apply MasterSeal P 173 quick drying solvent-based primer for Master Builders Solutions sealants ( Video Transcript). MasterSeal P 173 Quick Drying, Solvent-Based Primer packaged in a one pint can
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |